With the launch of the second phase, Nesto is taking another step forward. The first construction works began symbolically on November 17, 2025, on the Day of Struggle for Freedom and Democracy. The site, once part of the Iron Curtain, is now becoming a symbol of freedom and a fresh start.
Homes for Those Who Want MORE
Nesto Prime will offer a limited selection of 60 apartments. The design emphasizes space, privacy, and comfort. The portfolio includes spacious 3- and 4-bedroom apartments as well as maisonettes, with sizes starting from 90 m².

Each of the six residential buildings will house just 10 apartments, with only two units per floor, creating a naturally quiet and intimate living environment. Every apartment features a balcony, terrace, or front garden, providing space for relaxation or greenery right at home.
Each building will be equipped with state-of-the-art technology, including modern ceiling heating and cooling systems. This highly efficient and comfortable system is energy-saving, making it one of the best solutions available on the market.
Standard Features Included in the Price
Selected apartments in Nesto Prime now come with standard finishes included in the price. This means your apartment will be ready to furnish upon handover, without the need for additional construction work or extra investment.
The standard includes high-quality flooring, elegant tiles, designer sanitary fixtures and faucets, and flush interior doors. The finishes are chosen to be timeless, functional, and aesthetically balanced.
Flexible 10/90 Financing Option
The 10/90 financing model allows you to secure an apartment with a minimal upfront investment. Upon signing the Preliminary Purchase Agreement, you pay 10 %, and the remaining 90 % is due after completion, with the option to use a mortgage. This provides time and flexibility to plan your financing according to your needs.

Nesto – A Vibrant Neighborhood in Petržalka
In the future, Nesto will provide homes for up to 12,000 residents and bring full amenities to the area, including shops, restaurants, schools, and kindergartens. For active recreation, there is already direct access to the cycling path, with future plans for sports facilities and community spaces.
Another major advantage is excellent connectivity. Fast access to the city center or the highway is ensured via the adjacent bypass and public transport stops. The first stage, Na Námestí, with 180 apartments in three six-story buildings, is already completed. In the southern part of the site, construction continues with Nesto G apartment buildings, extending the successful concept of the first phase. Additional residential buildings in the southern area will be launched gradually, with two Nesto G buildings coming to market first.